Project: La Caja de Ahorro y Seguro Headquarters, Autonomous City of Buenos Aires, Argentina. Electric vehicle charging station powered by a 20KW Photovoltaic System installed on the roof. Charges: Cars, motorcycles, bicycles, scooters.Equipment...
Read moreINTERMEPRO/ NEW GUALEGUAYCHÚ PROJECT / STAGE II.
INTERMEPRO/ NEW GUALEGUAYCHÚ PROJECT / STAGE II. Work finished! A 100 kWp Grid Tie solar park was installed. Qcells panels. Schneider Electric Inverters.
Read moreOTERO RAMOS WINERIES, MENDOZA PV PROJECT
INTERMEPRO / MENDOZA, Bodegas OTERO RAMOS. Qcell / Inverter CL60 panels (Schneider Electric) were installed at Bodega Otero Ramos, Lujan de Cuyo, (Mendoza).
Read moreINTERMEPRO / METALURGICA ROMA, CÓRDOBA. PV PROJECT
INTERMEPRO / CORDOBA METALÚRGICA ROMA: 112 panels and 2 CL60, 44KWP INVERTERS were installed.
Read moreINTERMEPRO- COCA COLA PROJECT MAINTENANCE
INTERMEPRO- preventive maintenance of the COCA COLA Work (Buenos Aires, VEDIA 4090)
Read moreINTERMEPRO MIRAMAR PV PROJECT
6kw three-phase GRID TIE system, installed on a sheet metal roof in Miramar, ROG Installer.
Read moreCOCA COLA, EXTENSION OF PROJECT
INTERMEPRO-COCA COLA, expansion of Works. (Buenos Aires, VEDIA 4090) 110 polycrystalline modules of GCL P6/72 of 320 Wp, total of 35.2 kW. 2 SE Conext CL20000 inverters. 10 modules for heating water with solar energy.
Read moreINTERMEPRO/GUALEGUAYCHÚ: LAUNCH OF WORKS.
INTERMEPRO / GUALEGUYCHU , work launch . Sustainable Municipal Energy Plan: Work begins on the Solar Park that will supply energy to the effluent treatment plant.
Read moreINTERMEPRO: ROSARIO, LA SEGUNDA, start-up PART II
INTERMEPRO : ROSARIO, LA SEGUNDA, start-up Part II. 319 GCL 330W panels were installed 3 Schneider CL20 inverters, 2 CL25 inverters and approximately 100kWp in panels.
Read moreCORDOBA: We installed a photovoltaic plant in the Municipality of Córdoba.
Total power 80kw peak, 216 GCL panels of 365 watts peak each installed on 5 levels of the building. 2 SCHNEIDER ELECTRIC inverters of 60 kw connected to the main board. Remote control system of the plant and its production. .
Read moreSystem in Baradero, Province of Buenos Aires, autonomous 3KW.
Baradero: Autonomous 3KW system in Baradero, Province of Buenos Aires, made up of 9 370Wp GCL photovoltaic modules, 1 Schneider Electric inverter, Luminous PCU 3KW model, 1 48v 200Ah battery bank.
Read more