CORDOBA: Work completed at TEXXUS Camino a la Carbonada – Km 6.5 – Ferreyra – El Palmar Industrial Park – Warehouse Num 1. This system will be composed of: • 16 GCL brand photovoltaic modules of 325Wp each. • 1 Schneider...
Read moreCOCA COLA, PV PROJECT
The solar work was carried out for the new corporate building of the Coca-Cola company. The construction had to meet certain points in order to be certified with Leed. Among them was the supply of electrical energy through renewable generation...
Read moreAt Intermepro S.A we continue to renew solar and sustainable energy!!
We share the images of the project of our partner Sarico Distri S.A., carried out in Córdoba Capital on the roof of its offices with an installed power of 21.77kWp. 36 GCL photovoltaic modules of 370W and 26 modules of 325W were installed...
Read moreEDET S.A PROJECT (TUCUMÁN)
EDET S.A PROJECT In 2019, the installation of 366 solar panels was carried out in two buildings of the Metropolitan Administration. The work consists of 366 monocrystalline photovoltaic modules of 365 Wp, distributed on the roofs of the East and...
Read moreOFTACO PROJECT
The solar work was installed in a house under construction located in Victoria. It has 28 GCL M6/72 380w solar panels and 1 Luminous NXI310 inverter. The latter includes a monitoring adapter in order to be able to view the generation of the...
Read more“NAVE CULTURAL” OF MENDOZA. EMESA.
We keep renewing energy!! We share a new installation mounted on the “Nave Cultural” of Mendoza, (EMESA). We expanded the first part we did in that same building. The system has GCL M6/72H 370w panels, Schneider Electric CL inverters...
Read moreATMOSPHERIC WATER GENERATOR. FOR HOME, COMMERCIAL OR INDUSTRIAL USE.
The water is generated from the humidity of the air. They have a nine-layer nanofiltration system, which removes dust, residual chlorine, organic matter, harmful heavy metal iron, bacteria and viruses in the water. These teams promote...
Read moreLIBRARY OF THE CONGRESS OF THE NATION. SUSTAINABLE FIRE EXTINGUISHERS AND DECONTAMINATION IGNIX 16 .
Intermepro continues betting on sustainability with innovative equipment, this time we installed two IGNIX 16 sustainable fire extinguishing and decontamination units in the LIBRARY OF THE CONGRESS OF THE NATION. Through water microparticles...
Read moreInstallation of Grid-Tie photovoltaic renewable energy system. “INDUSTRY AUTOMAC SRL”
PROINGED – Aguirre Detour
For the “Provincial Program of Incentives for Distributed Energy Generation”, we inaugurated the “Desvío Aguirre” solar park in the town of Tandil, province of Buenos Aires. System: On Grid Location: Tandil, Buenos...
Read moreLibrary of the National Congress: Dome
• Sistema: On Grid • Ubicación: C.A.B.A • Paneles: 14 paneles marca GCL modelo M6/72GW de 345Wp cada uno • Kw en paneles: 6.21Kw • Inversores: 3 inversores marca SCHNEIDER ELECTRIC modelo Conext...
Read moreLibrary of the National Congress: Main Terrace
• Sistema: On Grid • Ubicación: C.A.B.A • Paneles: 130 paneles marca GCL modelo P6/72H de 370Wp cada uno • Kw en paneles: 46.62Kw • Inversores: 3 inversores marca SCHNEIDER ELECTRIC modelo Conext...
Read more