The solar work was carried out for the new corporate building of the Coca-Cola company. The construction had to meet certain points in order to be certified with Leed. Among them was the supply of electrical energy through renewable generation systems.
The installed system is on-grid, it has 110 GCL P6/72 330w solar panels and 2 Schneider Electric CL2000 inverters. The photovoltaic modules were mounted on the terrace of the building using tubular structures. embedded in the exposed concrete structure. which materialized especially for solar installation.