CORDOBA: Work completed at TEXXUS Camino a la Carbonada – Km 6.5 – Ferreyra – El Palmar Industrial Park – Warehouse Num 1.
CORDOBA: Work completed at TEXXUS Camino a la Carbonada – Km 6.5 – Ferreyra – El Palmar Industrial Park – Warehouse Num 1.
This system will be composed of:
• 16 GCL brand photovoltaic modules of 325Wp each.
• 1 Schneider Electric brand inverter, model Conext XW+ 7048 E.
• 1 Schneider Electric regulator, model Conext MPPT
80/600.
• 1 Battery Bank of 48v – 400Ah.
Solution Features:
Installed power in modules (nominal): 5.2 kWp
Power stored in Batteries (80% discharged): 15.36 kW