CORDOBA: Finalized proyect at TEXXUS Camino a la Carbonada – Km 6.5 – Ferreyra – Industrial Park “El Palmar” – Storage Num 1.

The system equipment is:

  • 16 Photovoltaic module, GCL brand, of 325Wp each.
  • 1 off-grid inverter, Schneider Electric brand, Conext XW+ 7048 model.
  • 1 charge regulator, Schneider Electric brand, Conext MPPT 80/600 model.
  • 1 battery Bank of 48V – 400Ah.

Solution Characteristics:

Power installed in modules (nominal): 5,2 kWp

Storaged Power in batteries (80% discharge): 15,36 kW

BACK-UP System for departments, houses and shops.

Voltu 14 kWh Back-Up energy System, installed at a department in Quartier Callao.